9. GARISSA SOLAR POWER PLANT TRANSMISSION LINE

Country Kenya
Location Garissa
Client China Jiangxi International Cooperation Limited
Contacts kenyasolar@cjic.cn
Description Augering and coring, standard penetration testing and undisturbed sampling of eight (8) boreholes to ten (10) metres each. Excavation of eight (8) trial pits to three(3) metres deep. Resistivity testing of sixteen (16) locations. Topographic survey of transmission line corridor
Year/ Duration Dec 2016

 

8. MUSHA-GABIRO- RULINDO 110KV TRANSMISSION LINE; RWANDA

Country Rwanda
Location Musha, Gabiro & Rulindo
Client Patronics Services Limited
Contacts Ranjeev Shah
info@patronicsservices.com
Description Resistivity testing, dynamic cone penetration testing and excavation of trial pits of 50 angle towers and 150 tower locations
Year/ Duration April/ May 2016

 

 

7. GARISSA SOLAR POWER PLANT

Country                  Kenya
Location Garissa
Client China Jiangxi International Cooperation Limited
Contacts Jiyong Yen              0704151989
Chenjiyong2003@163.com
Description Augering and coring, standard penetration testing and undisturbed sampling of forty (40) boreholes to ten (10) metres each. Fifty One (51) trial pits to three(3) metres deep. Resistivity testing of ninety one (91) locations. Topographic survey of the site.
Year/ Duration April/ May 2015

 

 

6. LAKE TURKANA WIND FARM

Country Kenya
Location Turkana
Client Enterprise Generale Malta Forrest
Contacts Eng Clemuer            0722716417
jcc@egmfkenya.co.ke
Description Augering and coring, standard penetration testing and undisturbed sampling of three hundred sixty five (365) boreholes to twenty (20) metres each.
Refraction Seismic Survey (365 points)
Year/ Duration April/November 2015

 

 

5. KINANGOP WIND FARM

Country Kenya
Location Kinangop
Client Enterprise Generale Malta Forrest
Contacts Eng Clemuer            0722716417
jcc@egmfkenya.co.ke
Description Augering and coring, standard penetration testing and undisturbed sampling of forty one (41) boreholes to twenty (20) metres each.
Refraction Seismic Survey (22 points)
Year/ Duration December/January  2013/14   


4. PROPOSED 132KV RAMISI POWER LINE

Country Kenya
 Location  Ramisi; Mombasa
 Client  Patronics Services Limited
 Contacts  Eng Rajeev Shah                0720854303
 info@patronicsservices.com
 Description  Augering and coring, standard penetration testing and undisturbed sampling of nine (9) boreholes to ten (10) metres each.
 Year/ Duration  August 2013

 

 

3. NGONG WINDPOWER II; WIND TURBINES

Country Kenya
Location Ngong Hills; Ngong
Client Enterprise Generale Malta Forrest
Contacts Eng Clemuer            0722716417
info@egmefkenya.co.ke
Description Augering and coring, standard penetration testing and undisturbed sampling of twelve (12) boreholes to fifteen (15) metres each.
Year/ Duration June  2013                

2. NGONG WINDPOWER II; SUBSTATION

Country Kenya
Location Ngong Hills; Ngong
Client Enterprise Generale Malta Forrest
Contacts Eng Clemuer            0722716417
info@egmefkenya.co.ke
Description Augering and coring, standard penetration testing and undisturbed sampling of two (2) boreholes to fifteen (15) metres each.
Year/ Duration March  2013

 

 

1. KENYA PIPELINE CORPORATION LINE 1 PIPELINE REPLACEMENT                    PROJECT         (NAIROBI – MOMBASA)

Country Kenya
Location Nairobi to Mombasa
Client Shengli Engineering & Consulting Company Ltd    
Contacts Chao            0714994032
Description Excavation and logging of three hundred (300) trial pits to three (3) metres each
Year/ Duration  August 2012